NVDA·NVIDIA Corporation
Q1 FY27·May 28, 2026
↑ Bullish
Key Metrics
Revenue
$44.1B+69% Y/Y
Beat +$2.0B
Non-GAAP EPS
$0.96
Beat +$0.06
Segment Breakdown
Data Center
+73% Y/Y↑ Bullish
Gaming
+42% Y/Y↑ Bullish
Automotive
+72% Y/Y↑ Bullish
Professional Visualization
+19% Y/Y↑ Bullish
Demand Signals
HBM·↑ BullishStrong

Blackwell GPU architecture entering volume ramp. Each GB200 GPU uses 192 GB of HBM3E — 2.4× the HBM content of H100. Data Center revenue $39.1B (+73% Y/Y), almost entirely driven by Blackwell. NVIDIA stated demand "far exceeds supply" and CoWoS advanced packaging remains the primary constraint on shipment volume.

NVIDIA Q1 FY27 Earnings·May 2026
PACKAGING·↑ BullishStrong

NVIDIA has reserved ~60% of TSMC CoWoS capacity through 2027, gating the entire AI chip industry. CEO Jensen Huang described CoWoS as "the most constrained part of the supply chain." Every competing AI chip maker — AMD, Broadcom custom ASICs, hyperscaler silicon — competes for the remaining 40%. NVIDIA's packaging lock is structurally equivalent to a supply chain moat.

NVIDIA Q1 FY27 Earnings / Digitimes Supply Chain·May 2026
COOLING·↑ BullishStrong

NVL72 rack (72× GB200 GPUs) draws 120kW requiring direct liquid cooling. NVIDIA partnering with Vertiv, Schneider Electric, and Coolit for certified liquid cooling solutions. Liquid-cooled NVL72 deployments now the majority of new hyperscaler AI cluster orders. NVIDIA's rack-scale architecture is single-handedly driving the liquid cooling industry transition.

NVIDIA GTC 2026 / Vertiv Partnership Announcement·Mar 2026
CPU·↑ BullishModerate

NVIDIA Grace CPU (ARM-based) gaining traction in Grace-Hopper Superchip deployments. Each GH200 pairs Grace CPU + H100 GPU on one module via NVLink-C2C. Grace CPU capturing AI server orchestration workloads — a beachhead in the data center CPU market Intel and AMD had previously owned entirely.

NVIDIA Q1 FY27 Earnings·May 2026
EML LASER·↑ BullishModerate

NVIDIA committed $4B to Lumentum and Coherent for EML laser supply, plus investments in Ayar Labs and Scintil Photonics for CPO. The move secures optical interconnect supply for NVLink and InfiniBand fabric through 2027+ while simultaneously betting on CPO replacing pluggable transceivers by 2029. Rivals building AI clusters cannot secure EML supply.

TrendForce / SEC 8-K Lumentum & Coherent·Mar 2026
TAM Estimates · 2026
AI GPU (Data Center)+28% CAGR
$175Bbase case
Bear $120BBase $175BBull $240B
AI Networking (NVSwitch)+35% CAGR
$14Bbase case
Bear $8BBase $14BBull $22B